Step 4 — Develop a detailed V,V&Tplan — The result is a phase-by-phase V,V&T
plan specifying V,V&T practices, as well as specific tasks, schedules, and
budgets. V,V&T Planning in the Total Project Context Project planning is one of
the ...
Step 4 — Develop a detailed V,V&Tplan — The result is a phase-by-phase V,V&T
plan specifying V,V&T practices, as well as specific tasks, schedules, and
budgets. V,V&T Planning in the Total Project Context Project planning is one of
the ...
Sayfa 376
FIGURE 58 ABBREVIATED OUTLINE OF A PROJECT V,V&T PLAN The
worksheets are suggested as documentation aids. Examples are presented
using these worksheets. For small projects it may be sufficient to abbreviate the
process, ...
FIGURE 58 ABBREVIATED OUTLINE OF A PROJECT V,V&T PLAN The
worksheets are suggested as documentation aids. Examples are presented
using these worksheets. For small projects it may be sufficient to abbreviate the
process, ...
Sayfa 383
Outputs of Step 4: o A Detailed V,V&T Plan Inputs to Step 4: o List of V,V&T
techniques and tools o Project schedule, budget, and personnel information o V,
V&T goals o Technique and tool selection assumptions Interrelationships with
other ...
Outputs of Step 4: o A Detailed V,V&T Plan Inputs to Step 4: o List of V,V&T
techniques and tools o Project schedule, budget, and personnel information o V,
V&T goals o Technique and tool selection assumptions Interrelationships with
other ...
Kullanıcılar ne diyor? - Eleştiri yazın
Her zamanki yerlerde hiçbir eleştiri bulamadık.
İçindekiler
LIFE CYCLE TESTING APPROACH | 23 |
TESTING AN APPLICATION SYSTEM TEST PLAN | 43 |
ASSESSING TEST PERFORMANCE | 343 |
Telif Hakkı | |
2 diğer bölüm gösterilmiyor
Diğer baskılar - Tümünü görüntüle
Sık kullanılan terimler ve kelime öbekleri
analysis application system audit trail automated Boundary Value Analysis checklist complete Confirma Control Flow Analysis correct cyclomatic complexity data processing defined design phase design review determine documentation Dynamic effectiveness of testing ensure ERor errors essential complexity evaluate example execution FIGURE flowchart Functional Testing graph identified input Inspec Inspections integrated test manual ments method methodology modules normally operations output paths peer review performed personnel PHASE TEST problems procedures production program phase project team provides records regression testing requirements phase responsibility risk matrix SDLC simulation software testing Static static analysis Step structure subphase system test systems development techniques and tools test conditions test cost test criteria test data test factor test phase test plan test process test team test transactions testing techniques TESTING TOOLS APPENDIX tion/ex tions TOOLS APPENDIX NAME V,V&T plan V/N aivnoaav validation verify Volume testing walk-through