The two recommended test tools for the installation phase are checklists and
acceptance testing test tools . Checklists provide the test team with a tool to
ensure all the appropriate steps have been followed , while the acceptance
testing tool ...
The two recommended test tools for the installation phase are checklists and
acceptance testing test tools . Checklists provide the test team with a tool to
ensure all the appropriate steps have been followed , while the acceptance
testing tool ...
Sayfa 459
Acceptance test criteria are predetermined expectations from the operation of the
application system . The criteria become the measure against which the
application system is tested to determine whether or not the predefined standard
has ...
Acceptance test criteria are predetermined expectations from the operation of the
application system . The criteria become the measure against which the
application system is tested to determine whether or not the predefined standard
has ...
Sayfa 507
NAME | Acceptance Criteria Tested NUMBER 5 METRIC Acceptance criteria
verified divided by total acceptance . DESCRIPTION OF METRIC The value of an
application system is in meeting the user objectives . If those objectives are
defined ...
NAME | Acceptance Criteria Tested NUMBER 5 METRIC Acceptance criteria
verified divided by total acceptance . DESCRIPTION OF METRIC The value of an
application system is in meeting the user objectives . If those objectives are
defined ...
Kullanıcılar ne diyor? - Eleştiri yazın
Her zamanki yerlerde hiçbir eleştiri bulamadık.
İçindekiler
1985 SURVEY ON SOFTWARE TESTING | 37 |
TESTING AN APPLICATION SYSTEM TEST PLAN | 43 |
PROGRAM PHASE TESTING | 209 |
Telif Hakkı | |
3 diğer bölüm gösterilmiyor
Diğer baskılar - Tümünü görüntüle
Sık kullanılan terimler ve kelime öbekleri
acceptance achieve action activities ADEQUATE ADEQUATE amination analysis ance application system appropriate ASSESSMENT authorization automated checking Checklist complete Compli conducted Confirm continued correct cost cycle data processing defects defined described DESCRIPTION detailed determine documentation effective ensure error established evaluate Examine example execution expected Fact finding FIGURE function graph identified implemented INDICATIVE individual input Inspec installation integrity involved limit maintenance manual measure ments method methodology METRIC modules needed normally objectives occur operations output paths performed personnel PHASE TEST prepared problems procedures production properly reasonableness RECOMMENDED TEST records recovery requirements responsibility risk selected shows skills specifications Step structure techniques TEST CRITERIA test data TEST FACTOR test process TEST TECHNIQUE TEST TEST TEST TOOL tion/ex tions trail transactions validation Verify