... Test Objectives Many problems exist in intersystem testing . One is that it ... test . Thus , the cost may be expensive , especially if the systems have to ... integrated test facility . This permits testing to occur during a production ...
... Test Objectives Many problems exist in intersystem testing . One is that it ... test . Thus , the cost may be expensive , especially if the systems have to ... integrated test facility . This permits testing to occur during a production ...
Sayfa 304
William E. Perry. Integrated Test Facility Test Tool The integrated test facility provides a repository for test data so that testing can occur any time the application is in operation . The test data can be stored in a predefined ...
William E. Perry. Integrated Test Facility Test Tool The integrated test facility provides a repository for test data so that testing can occur any time the application is in operation . The test data can be stored in a predefined ...
Sayfa 483
William E. Perry. NAME : Integrated Test Facility TESTING TOOLS APPENDIX NUMBER : 25 TYPE : Manual Automatic Static Dynamic Structural Functional COST : High Medium Low SKILL : User Systems Program Technical DESCRIPTION The integrated ...
William E. Perry. NAME : Integrated Test Facility TESTING TOOLS APPENDIX NUMBER : 25 TYPE : Manual Automatic Static Dynamic Structural Functional COST : High Medium Low SKILL : User Systems Program Technical DESCRIPTION The integrated ...
Diğer baskılar - Tümünü görüntüle
Sık kullanılan terimler ve kelime öbekleri
ADEQUATE ADEQUATE ADEQUATE V/N RECOMMENDED amination analysis ance Compli application system audit trail automated Boundary Value Analysis Checklist complete compliance Confirm Control Flow Analysis correct cyclomatic complexity Data flow analysis defined design review determine documentation effectiveness of testing employee ensure evaluate example execution Fact finding FIGURE file integrity Functional Testing graph identified input Inspec installation phase interface ments method methodology modules needed normally objectives output paths peer review performed personnel PHASE TEST PROCESS problems procedures PROCESS TEST FACTOR production program phase project team RECOMMENDED TEST TEST records recovery regression testing requirements phase responsibility risk matrix SDLC software testing subphase systems development TECHNIQUE TEST TOOL techniques and tools test conditions test cost test data test phase test plan TEST PROCESS TEST test team TEST TECHNIQUE TEST TEST TEST TECHNIQUE test transactions TESTING TOOLS APPENDIX tion/ex updated V/N RECOMMENDED TEST Verify Volume testing walk-through