The schedule should consider : o 0 Establishing the start and stop dates for
testing in each phase of the life cycle Notifying the personnel involved in the
project development and testing of the scheduled test dates Establishing a critical
testing ...
The schedule should consider : o 0 Establishing the start and stop dates for
testing in each phase of the life cycle Notifying the personnel involved in the
project development and testing of the scheduled test dates Establishing a critical
testing ...
Sayfa 200
ASSESSMENT finding ASSESSMENT ASSESSMENT Have the people involved
been presented their tasks. DESIGN PHASE TEST PROCESS TEST FACTOR :
Design Conforms to Requirements VERY ADEQUATE ADEQUATE ADEQUATE ...
ASSESSMENT finding ASSESSMENT ASSESSMENT Have the people involved
been presented their tasks. DESIGN PHASE TEST PROCESS TEST FACTOR :
Design Conforms to Requirements VERY ADEQUATE ADEQUATE ADEQUATE ...
Sayfa 503
The more user involvement , generally the more successful the application
system . This metric attempts to measure user participation in testing on the basis
that the more involved the user the higher the probability that the installed
application ...
The more user involvement , generally the more successful the application
system . This metric attempts to measure user participation in testing on the basis
that the more involved the user the higher the probability that the installed
application ...
Kullanıcılar ne diyor? - Eleştiri yazın
Her zamanki yerlerde hiçbir eleştiri bulamadık.
İçindekiler
1985 SURVEY ON SOFTWARE TESTING | 37 |
TESTING AN APPLICATION SYSTEM TEST PLAN | 43 |
PROGRAM PHASE TESTING | 209 |
Telif Hakkı | |
3 diğer bölüm gösterilmiyor
Diğer baskılar - Tümünü görüntüle
Sık kullanılan terimler ve kelime öbekleri
acceptance achieve action activities ADEQUATE ADEQUATE amination analysis ance application system appropriate ASSESSMENT authorization automated checking Checklist complete Compli conducted Confirm continued correct cost cycle data processing defects defined described DESCRIPTION detailed determine documentation effective ensure error established evaluate Examine example execution expected Fact finding FIGURE function graph identified implemented INDICATIVE individual input Inspec installation integrity involved limit maintenance manual measure ments method methodology METRIC modules needed normally objectives occur operations output paths performed personnel PHASE TEST prepared problems procedures production properly reasonableness RECOMMENDED TEST records recovery requirements responsibility risk selected shows skills specifications Step structure techniques TEST CRITERIA test data TEST FACTOR test process TEST TECHNIQUE TEST TEST TEST TOOL tion/ex tions trail transactions validation Verify