A Structured Approach to Systems Testing |
Kitabın içinden
81 sonuçtan 1-3 arası sonuçlar
Sayfa 239
Two test tools particularly recommended for testing during the test phase are test
data and volume testing test tools . Test data can be used to create as many of
the test conditions as deemed necessary to evaluate the application . Volume ...
Two test tools particularly recommended for testing during the test phase are test
data and volume testing test tools . Test data can be used to create as many of
the test conditions as deemed necessary to evaluate the application . Volume ...
Sayfa 257
Error handling Test data & | Test data generator Have tests been performed
testing data relationships to reject those not conforming to system specifications ?
Verify that the system rejects data relationships which do not conform to system ...
Error handling Test data & | Test data generator Have tests been performed
testing data relationships to reject those not conforming to system specifications ?
Verify that the system rejects data relationships which do not conform to system ...
Sayfa 266
Verify that the data retention procedures perform in accordance with systems
requirements . Requirements | Test data & Test data generator Test PHASE TEST
PROCESS TEST FACTOR : Manual Support Testing. Do the normal transaction ...
Verify that the data retention procedures perform in accordance with systems
requirements . Requirements | Test data & Test data generator Test PHASE TEST
PROCESS TEST FACTOR : Manual Support Testing. Do the normal transaction ...
Kullanıcılar ne diyor? - Eleştiri yazın
Her zamanki yerlerde hiçbir eleştiri bulamadık.
İçindekiler
1985 SURVEY ON SOFTWARE TESTING | 37 |
TESTING AN APPLICATION SYSTEM TEST PLAN | 43 |
PROGRAM PHASE TESTING | 209 |
Telif Hakkı | |
3 diğer bölüm gösterilmiyor
Diğer baskılar - Tümünü görüntüle
Sık kullanılan terimler ve kelime öbekleri
acceptance achieve action activities ADEQUATE ADEQUATE amination analysis ance application system appropriate ASSESSMENT authorization automated checking Checklist complete Compli conducted Confirm continued correct cost cycle data processing defects defined described DESCRIPTION detailed determine documentation effective ensure error established evaluate Examine example execution expected Fact finding FIGURE function graph identified implemented INDICATIVE individual input Inspec installation integrity involved limit maintenance manual measure ments method methodology METRIC modules needed normally objectives occur operations output paths performed personnel PHASE TEST prepared problems procedures production properly reasonableness RECOMMENDED TEST records recovery requirements responsibility risk selected shows skills specifications Step structure techniques TEST CRITERIA test data TEST FACTOR test process TEST TECHNIQUE TEST TEST TEST TOOL tion/ex tions trail transactions validation Verify